亚洲国产日韩欧美在线a乱码,国产精品路线1路线2路线,亚洲视频一区,精品国产自,www狠狠,国产情侣激情在线视频免费看,亚洲成年网站在线观看

IQC工程師優(yōu)秀英文簡歷模板

發(fā)布時間:2017-04-20 編輯:瑩瑩 手機版

  針對不同的職位,應(yīng)該有自己特定的簡歷,下面,YJBYS小編為大家?guī)硪环軮QC工程師優(yōu)秀英文簡歷模板供大家參考借鑒,希望能夠幫到大家。

  Name: Ms. l Gender: Female

  Wedlock: Single Nation: Han

  Residence: Hunan-Changde Age: 27

  Location: Guangdong-Guangzhou Height: 157cm

  Target Locations: Guangdong-Guangzhou

  Target Positions: Quality/Safety Management-QA/QC Manager/Supervisor

  Quality/Safety Management-Supplier Quality Engineer

  Industry/Factories-Project Engineer

  Target Jobs: QA superior、 SQE/CQE、 project engineer

  Desired Salary: 7500 RMB/month Negotiable

  When Can Start: after 2017-08-16 later

  Education

  2008-09 ~ 2011-06 zhongshan university administration Bachelor Degree

  Training

  2013-04 ~ 2013-06 new oriental school cambridge speaking

  2012-06 ~ 2013-04 sony electronics huanan co.,Ltd Japanese(level 3) Japanese(level 3)

  2006-12 ~ 2007-03 foshan library public english test system PETS-3

  2006-07 ~ 2006-11 foshan library Japanese(primary)

  【you are not full member,please contact us.】 (2010-08 ~ Present)

  Company Type: Foreign Enterprise Company Category: Electrical,Micro-electronics

  Job Title: supplier quality engineer Positions: Supplier Quality Assurance

  Job Description: Company engages in the production of DVD laser writer, is a precise manufacturing, each product is assembled by 30 ~ 40 components(include hardware parts/electronic parts/optical parts). the major work during this period is supplier quality assurance, include that support supplier improving their quality and check quality system for keeping the stability.

  1.evaluate the parts when new model is imported , discuss the demensions which are out of the spec. with the designer of headquarters in Japan, desinger will determine the ultimate judgement.

  2.when new model begin to get in mass production, establish the document for parts on line and shipment.

  3.According to the instruction of parts'approved specification and CTQ list ,establish the standard of inspection , educate the inspectors take the correct operation.

  4.review the limited the samples which are submitted by suppliers, discuss with relevant departments, if that's necessary, must be taken test-run to verify. after getting the conclusion by discussion,submit it to designer to make the final decision.

  5.handle the qualiy issues for parts' defect,if it gets great affect in production,must call an urgent meeting to discuss the further action.

  6.evaluated suppliers's quality/server/cooperation etc ,got the list of up-steam suppliers,summarized their quality issues and established the plan for improvement.

  7.implement AQAS audit based on the annual plan to verify supplier's quality system. (the auditor must get the qualification which is approved by Sony headquarters)

  8.company begins to implement self-inspection plan to supplier, give some inforation to the suppliers and introduce its guidance(the detailed instructions must be explained again by quality manager), and according to the plan implement audits on-site, connect sony headquarters to issue certification for qualified suppliers.

  9.establish QC flow for parts and make the managing plan for major suppliers base on headquarters's request.

  10.some of projects which were encouraged by company had been involved.(such as:cost down PJ/success PJ,etc.)

  Reason for Leaving: contract expiry

  【you are not full member,please contact us.】 (2007-12 ~ 2010-06)

  Company Type: Foreign Enterprise Company Category: Electrical,Micro-electronics

  Job Title: SQE Positions: Supplier Quality Engineer

  Job Description: the company goes in for the production of thermal module , the component have many categories,for example,press/die-casting/extrusion/plastic,the major avail of the modules are used in VGA/DT/NB area,because of different parts with different process,so that ,incoming quality control include many contents, as below:

  1.comfirm parts in trail run phase and feedback the information .

  2.attend to the approval of new parts and PPAP's check.

  3.collect incoming issues and confirm the corrective action in periodic time,which lead vendor to improve quality.

  4.establish standard of inspection for product.

  5.audit vendor's quality ,service ,cooperation and timely for 8D report reply,take advice require improvement.

  6.deal with the defects parts after production,take negotiation with vendors,find out the responsibility and charge the cost,has saved nearly 3 million(RMB) for company in past two years.

  Reason for Leaving: orders decreased result in the job without energy

欄目推薦
最新推薦
熱門推薦