亚洲国产日韩欧美在线a乱码,国产精品路线1路线2路线,亚洲视频一区,精品国产自,www狠狠,国产情侣激情在线视频免费看,亚洲成年网站在线观看

英文合同

時間:2023-05-05 13:44:26 合同范本 我要投稿

關于英文合同合集五篇

  在人民愈發(fā)重視法律的社會中,合同對我們的約束力越來越不可忽視,簽訂合同也是避免爭端的最好方式之一。那么大家知道合同的格式嗎?下面是小編為大家整理的英文合同5篇,希望能夠幫助到大家。

關于英文合同合集五篇

英文合同 篇1

  合 同 CONTRACT

  日期: 合同號碼:

  Date: Contract No.:

  買 方: (The Buyers)

  Address/TEL/FAX/E-mail

  賣方: (The Sellers)

  Address/TEL/FAX/E-mail

  本合同雙方,公司(以下稱甲方)與(以下稱乙方), 在平等互利基礎上,通過友好協(xié)商,于 某年某月某日在中國(地址),特簽訂本合同

  This contract is hereby (特此) made and concluded by and between co.,(hereinafter referred to as party A) and Co.,(hereinafter referred to as party B) on (date),in (place), china, on the principle of equality and mutual benefit and through amicable(friendly) consultation 雙方有爭議,應首先通過友好協(xié)商解決

  All disputes arising from the execution of this agreement shall be settled through friendly consultations

  茲經(jīng)買賣雙方同意按照以下條款由買方購進,賣方售出以下商品:

  This contract is made by the Buyers and the Sellers; whereby the Buyers agree tobuy and the Sellers agree to sell the following goods subject to the terms and conditions as stipulated follow:

  (1) 商品名稱、規(guī)格、質(zhì)量Name of Commodity、specifications quality of commodity

  (2) 數(shù) 量:Quantity:允許----的溢短裝 ---% more or less allowed

  (3) 單 價: Unit price:

  (4) 總 值:Total Value/ Total Amount

  (5) 包 裝:Packing:

  貨物應具有防潮、防銹蝕、防震并適用于海洋運輸?shù)陌b,由于貨物包裝不良而造成的貨物殘損、滅失應由賣方負責。賣方應在每個包裝箱上用不退色的顏色標明尺碼、包裝箱、毛重、凈重、及“此端向上”“防潮”、“小心輕放”易碎fragile 等標記。

  The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock,( The packing of the goods must be well protected against dampness, moisture, rust, and be able to stand shock) and shall be suitable for ocean transportation/multiple transportation. The seller shall be liable for all damage and losses of the goods attributable to (caused by)the inadequate orimproper packing. The measurement , gross weight, net weight and the cautions such as “do not stack up side down”(this way up)”keep away from moisture” “handle with care”shall be stenciled (marked)on the surface of each package with fadeless pigment.

  (6) 生產(chǎn)國別:Country of Origin :

  (7) 支付條款:Terms of Payment:L/C、D/P、D/A、COD(cash on delivery)

  () 信用證式:買應在裝運期前/合同生效后__日,開出以賣為受益人的不可撤銷的議付信用證,信用證在裝船完畢后__日內(nèi)到期。

  Letter of Credit: The Buyer shall, ______ days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire ____ days after the completion of loading of the shipment as stipulated.

  () 付款交單:貨物發(fā)運后,賣方出具以買方為付款人的'付款跟單匯票,按即期付款交單(D/P)式,通過賣銀行及_____銀行向買轉(zhuǎn)交單證,換取貨物。

  Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and ______ Bank to the Buyer against payment, i.e D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.

  即期付款交單D/P at sight

  跟單匯票documentary draft

  Upon first presentation the Buyer shall pay against documentary draft drawn by the Seller at sight. The Shipping documents are to be delivered against payment only.

  買方應憑賣方開具的即期跟單匯票于見票時立即付款,付款后交單。

  () 承兌交單:貨物發(fā)運后,賣出具以買為付款人的付款跟單匯票,付款期限為____后__日,按即期承兌交單(D/A__日)式,通過賣銀行及______銀行,經(jīng)買承兌后,向買轉(zhuǎn)交單證,買在匯票期限到期時支付貨款。

  Documents against Acceptance: After shipment, the Seller shall draw a sight bill of exchange, payable_____ days after the Buyers delivers the document through Seller’s bank and _________Bank to the Buyer against

  acceptance (D/A ___ days). The Buyer shall make the payment on date of the bill of exchange.

  () 貨到付款:買在收到貨物后__天內(nèi)將全部貨款支付賣(不適用于FOB、CRF、CIF術(shù)語)。

  Cash on delivery (COD): The Buyer shall pay to the Seller total amount within ______ days after the receipt of the goods (This clause is not applied to the Terms of FOB, CFR, CIF).

  (8) 保 險:insurance:由----按發(fā)票金額110%投保--- 險和---附加險

  Insurance shall be covered by the ----for 110% of the invoice value against-----risks and additional risks

  (9) 裝運期限: Time of Shipment:

  (10) 起 運 港:Port of Lading:

  (11) 目 的 港: Port of Destination:

  單據(jù)(Documents Required):

  賣應將下列單據(jù)提交銀行議付/托收:

  The Seller shall present the following documents required to the bank for negotiation/collection:

  () 標明通知收貨人/受貨代理人的全套清潔的、已裝船的、空白抬頭、空白背書并注明運費已付/到付的海運/聯(lián)運/陸運提單。

  Full set of clean on board Ocean/Combined Transportation/Land Bills of Lading and blank endorsed marked freight prepaid/ to collect;

  () 標有合同編號、信用證號(信用證支付條件下)及裝運嘜頭的商業(yè)發(fā)票一式__份;

  Signed commercial invoice in ______copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks;

  () 由______出具的裝箱或重量單一式__份;

  Packing list/weight memo in ______ copies issued by__;

  () 由______出具的質(zhì)量證明書一式__份;

  Certificate of Quality in _______ c(轉(zhuǎn)載于:www.773N.co m校 園生活 網(wǎng):合同號碼英文)opies issued by____;

  () 由______出具的數(shù)量證明書一式__份;

  Certificate of Quantity in ___ copies issued by____;

  () 保險單本一式__份(CIF 交貨條件);

  Insurance policy/certificate in ___ copies (Terms of CIF);

  ()____簽發(fā)的產(chǎn)地證一式__份;

  Certificate of Origin in ___ copies issued by____;

  () 裝運通知(Shipping advice): 賣應在交運后_____小時內(nèi)以特快專遞式郵寄給買上述第__項單據(jù)副本一式一套。

  EMS郵政特快專遞

  The Seller shall, within ____ hours after shipment effected, send by courier each copy of the above-mentioned documents No. __.

  一式兩份:in duplicate; 一式三份:in triplicate;一式四份:in

  quadruplicate

  The fax contract has same force as effect as origin form

  本合同傳真件具有法律效力

  運輸方式:terms of delivery FOB/CFR/CIF

  () FOB交貨式

  賣方應在合同規(guī)定的裝運日期前天,以____式通知買合同號、品名、數(shù)量、金額、包裝件、毛重、尺碼及裝運港可裝日期,以便買安排租船/訂艙。裝運船只按期到達裝運港后,如賣不能按時裝船,發(fā)生的空船費或滯期費由賣負擔。在貨物越過船弦并脫離吊鉤以前一切費用和風險由賣方負擔。

  The Seller shall, days before the shipment date specified in the Contract, advise the Buyer by _______ of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of(in case) the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus

英文合同 篇2

  Contract for Equipment Sales and Technology Licensing

  Contract No. ____________________

  This Contract (hereinafter referred to as the “Contract”) is made and entered into as of ________ (the date of signature ) in ________ (the place of signature) through friendly negotiation by and between _____________, a company incorporated and existing under the laws of ____________ with its registered address at _________________________________, and with its principal place of business at _________________________________ (hereinafter referred to as the “Buyer”), and ____________________, a company incorporated and existing under the laws of the People’s Republic of China with its registered address at _________________________________, and with its principal place of business at _________________________________(hereinafter referred to as the “Seller”).

  Whereas, the Buyer desires to engage the Seller to provide the Equipment, related design, Technical Documentation, Technical Service and Technical Training and to obtain from the Seller a license of Patent and/or Know-how in relation to the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products. Now it is hereby mutually agreed as follows:

  Article 1 Definitions

  1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article 11.5.

  1.2 “Commissioning” means the operation of the Equipment in accordance with Article 11.4 for the purpose of carrying out Performance Test.

  1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.

  1.4 “Contract Products” refers to all types of the products manufactured with Patent and/or Know-how under the Contract, details of which are specified in Appendix 1.

  1.5 “Destination Airport” refers to _____________Airport.

  1.6 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 18.1.

  1.7 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.

  1.8 “Erection” means placing the Equipment to the positions according to the design drawings, and connecting it with relevant equipment and utilities.

  1.9 “Improvement” refers to new findings and/or modifications made in the validity period of the Contract by either party on Patent and/or Know-how in the form of new designs, formulas, recipes, ingredients, indices, parameters, calculations, or any other indicators.

  1.10 “Job Site” means the site where the Equipment shall be located and/or erected, namely ____.

  1.11 “Know-how” refers to any valuable technical knowledge, data, indices, drawings, designs and other technical information, concerning the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment as well as manufacture of the Contract Products, developed and owned or legally acquired and possessed by the Seller and disclosed to the Buyer by the Seller, which is unknown to either public or the Buyer before the Date of Effectiveness of this Contract, and for which appropriate protection measures have been taken by the Seller for keeping Know-how in secrecy. The specific description of Know-how is set forth in Appendix 3.

  1.12 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached ____ ( ) percent of the total Equipment price.

  1.13 “Patent” refers to any and all of the effective patent rights possessed by the Seller and licensed to the Buyer under the Contract in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, the No. and list of which are set forth in Appendix 3.

  1.14 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures specified in Appendix 1.

  1.15 “Technical Documentation” means the technical indices and data, specifications, drawings, processes, technical and quality standards, and other documents carrying the descriptions and explanations of Patent, Know-how and other technical information, in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, to be provided by the Seller as listed in Appendix 4.

  1.16 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller as per Appendix 6.

  1.17 “Technical Training ” means the training rendered by the Seller as per Appendix 7.

  1.18 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.

  1.19 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 12.2, during which the Seller is responsible for the defects of the Equipment as per Article 12.

  Article 2 Scope of the Contract

  2.1 The Seller’s Obligation

  2.1.1 The Seller shall supply the Equipment, provide the design, Technical Documentation, and conduct the Technical Service and Technical Training, and grant the Buyer a right to use the Patent and/or Know-how as set forth in the Contract.

  2.1.2 The Seller shall supply the Equipment which is listed in Appendix 3, the specification is detailed in Appendix 1.

  2.1.3 The Seller shall provide design in accordance with Appendix 5, and submit to the Buyer the Technical Documentation listed in Appendix 4.

  2.1.4 The Seller shall conduct the Technical Services at the Job Site as per Appendix 6.

  2.1.5 The Seller shall conduct the Technical Training as per Appendix 7.

  2.2 The Buyer’s Obligation

  2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as per Appendix 2. The Buyer shall ensure the completeness, correctness and accuracy of all such information and data.

  2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them to the Job Site in time.

  2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run, Commissioning and Performance Test in accordance with the Technical Documentation under the Technical Services rendered by the Seller as per Appendix 6.

  2.2.4 The Buyer shall at his own costs and expenses, supply all the equipments, spare parts and facilities required, except for the Equipment supplied by the Seller as per Appendix 3.

  2.2.5 The Buyer shall at his own costs and expenses, provide the qualified and appropriate technical personnel, labor, tools, utilities and the Job Site in time for Erection, Test Run, Commissioning, and Performance Test as specified in Appendix 2.

  2.2.6 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.

  Article 3 Grant of License

  3.1 The Seller agrees to grant to the Buyer and the Buyer agrees to obtain from the Seller a license to manufacture the Contract Products as well as to conduct Erection, Test Run, Commissioning, Performance Test, operation and maintenance for the Equipment with Patent and/or Know-how as well as to use and sell the Contract Products. The name, model, specification, and technical data of the Contract Products are detailed in Appendix 1. The Buyer shall not make use of Patent and/or Know-how for any purposes other than those stipulated in the Contract without prior written approval from the Seller. The annual output of the Contract Products manufactured by the Buyer shall in no case exceed _______________.

  3.2 (Option 1) The license granted under the Contract shall be an exclusive license. The Seller shall not retain its right to grant the licenses to any third parties, or to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

  (Option 2) The license granted under the Contract shall be a non-exclusive license. The Seller shall retain its right to grant the licenses to any third parties, and to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.

  3.3 The license granted under the Contract shall be a non-transferable and non-sublicensing license, under which the Buyer shall neither be entitled to transfer nor grant sub-license to any third party without prior written approval from the Seller.

  3.4 Territory

  3.4.1 The Seller agrees to grant the license to the Buyer only within the territory of _________________ (country or region). The Buyer shall not explore Patent and/or Know-how in any place other than the Job Site without previous written consent of the Seller.

  3.4.2 The Seller agrees to grant a license to the Buyer to use and sell the Contract Products only within the territory of ________________________ (Country or region). In case the Buyer fails to perform its obligations under this Clause, all the actual losses and damages thus incurred to the Seller shall be borne by the Buyer, and the Seller shall have the right to terminate the Contract without prejudice to any remedies specified in the Contract.

  Article 4 Price

  4.1 The Buyer agrees to pay the total Contract price, Technical Training and Technical Service fee to the Seller.

  4.2 The total Contract price, including price of the Equipment, design, Technical Documentation and a license fee in a fixed amount, shall be __________(say _______________________ only).

  The breakdown price is as follows:

  The price for Equipment is __________(say _______________________ only).

  Fee for design is __________(say _______________________ only).

  Fee for Technical Documentations is __________(say _______________________ only).

  License fee is __________________(Say: _________________ only)

  4.2.1 The total Contract price for the Equipment is for delivery CIF_____ Port, and the Technical Documentations is for delivery CIP (by air) ______ Airport. CIF and CIP term shall be interpreted in accordance with INCOTERMS 20xx, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).

  4.2.2 The total Contract price includes the price for spare parts listed in Appendix 3. However, the total Contract price does not cover the supply of any other spare parts. At the Buyer’s request, the Seller may provide with any other spare parts. A separate agreement shall be signed between the parties.

  4.2.3 The above price is fixed and firm.

  4.3 The total Contract price does not cover the Technical Service fee and Technical Training fee specified in Appendix 6,7.

  4.4 The total Contract price as well as the Technical Training and Technical Service fee shall not be regarded or in any way be explained or interpreted as covering any of the custom duties, taxes, or charges, fees, and expenses unless expressly listed in the Contract.

  Article 5 Payment

  5.1 Down Payment

  Within ____ ( ) days after signing the Contract, the Buyer shall pay ____ ( ) percent of the total Contract price amounting ____ by T/T to the Seller.

  ......................The Beginning of Option.......................

  5.2 [Option One: Payment by Sight L/C]

  The balance of the total Contract price amounting ___ ( says ___ only ) shall be paid by an irrevocable Letter of Credit at sight, issued within ___ ( ) days after signing the Contract by a reputable bank in ___ acceptable to the Seller in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents till ______(specific expiration date or a specific circumstance for the expiration of the Letter of Credit).

  5.2.1 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

  (a) Bill of Lading in one (1) original and ___ ( ) copies;

  (b) Commercial Invoice in one (1) original and ___ ( ) copies;

  (c) Packing list in one (1) original and ___ ( ) copies;

  (d) Certificate of Origin in one (1) original and ___ ( ) copies;

  (e) Insurance Policy in one (1) original and ___ ( ) copies;

  5.2.2 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

  (a) One (1) copy of the Acceptance Certificate signed by the Buyer as per Article 11.5, or the Seller’s written statement specifying the lapse of more than seven (7) days after the Seller’s notice requesting the Buyer to issue the Acceptance Certificate in accordance with Article 11.5;

  (b)One ( 1 ) copy of commercial invoice.

  5.2.3 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:

  a) One (1) original Letter of Retention Guarantee in the form of Appendix 10;

  b) One (1) copy of Commercial Invoice.

  5.2 [Option Two: Payment under a L/G]

  The balance of the total Contract price amounting ___ (say ___ only ), plus interest for deferred payment in the amount of ___ (say ___ only ), totaling ___ (say ___ only ) as detailed in Appendix 12 shall be paid by the Buyer by installments as specified in Appendix 12 and backed by an irrevocable Letter of Guarantee in favor of the Seller as per the Appendix 11, issued within ___ ( ) days after signing the Contract by the reputable bank in ____ acceptable to the Seller.

  ......................The End of Option.......................

  5.3 All the banking charges incurred in the Seller’s bank shall be borne by the Seller while those incurred outside the Seller’s bank shall be borne by the Buyer.

  Article 6 Delivery of Equipment and Technical Documentation

  6.1 The Delivery of the Equipment

  6.1.1 The delivery of the Equipment listed in Appendix 3 shall be completed within ____ ( ) months from the Effective Date of the Contract.

  6.1.2 Within ____ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by fax.

  Not later than ____ ( ) days before the first shipment, the Seller shall submit to the Buyer the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.

  6.1.3 The port of shipment is ____, while the port of destination is ____.

  6.1.4 Advance shipment, partial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.

  6.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date.

  6.1.6 The Seller shall notify the Buyer by fax of the following within five (5) working days after each shipment is effected:

  (a) Contract number

  (b) Name of the vessel and loading port

  (c) Name of the Equipment shipped

  (d) Number and date of Bill of Lading

  (e) Total volume

  (f) Total gross and net weight

  (g) Total number of packages/cases

  6.1.7 The Seller shall airmail the following documents in duplicate to the Buyer:

  (a) Bill of Lading

  (b) Commercial Invoice

  (c) Packing List

  (d) Certificate of Origin

  (e) Insurance Policy.

  6.2 The Late Delivery of the Equipment

  6.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer liquidated damages for such delay at the following rates:

  (a) From the first week to the fourth week, the liquidated damages shall be

  ____ ( ) percent of the value of the delayed portion of the Equipment per

  week

  (b) From the fifth week to the eighth week, the liquidated damages shall be

  ____ ( ) percent of the value of the delayed portion of the Equipment per week

  (c) From the ninth week, the liquidated damages shall be ____ ( ) percent of

  the value of the delayed portion of the Equipment per week

  6.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed ____ ( ) percent of the value of the delayed portion Equipment.

  6.2.3 The Seller shall be released from the liability to the Buyer whatsoever in respect of the late delivery after his payment of liquidated damages in accordance with Article 6.2. Notwithstanding the Seller’s payment of the liquidated damages for the late delivery Equipment, the Seller shall not be released from his obligation to deliver the Equipment.

  6.3 The Delivery of the Technical Documentation

  6.3.1 The Technical Documentation listed in Appendix 4 shall be delivered CIP ____airport by air within ____ ( ) months after the Effective Date of the Contract.

  6.3.2 The date of airway bill shall be regarded as the actual delivery date of the Technical Documentation.

  6.3.3 Within ____ ( ) working days after sending each lot of the Technical Documentation, the Seller shall inform the Buyer of the Contract number, item number, number and date of airway bill and the flight.

英文合同 篇3

  purchase contract

  特別提示:

  (1)斟酌后才勾畫所適用的條款,附加條款應寫清。

  (2)應有專人負責交易的全過程及處理相關的事務。

  (3)收、發(fā)的文件仔細斟酌和妥善保存。

  (4)不要超越商檢、索賠期限,以免喪失主張權(quán)利的時機。

  (5)及時行使撤銷權(quán)和不安抗辯權(quán),并通知對方。

  合同編號 (contract no.):_______

  簽訂日期 (date):__________

  簽訂地點 (signed at):_________

  買方:____________________________

  the buyer:_________________________

  地址:____________________________

  address: __________________________

  電話(tel):________傳真(fax):____________

  電子郵箱(e-mail):______________________

  賣方:____________________________

  the seller:_________________________

  地址:____________________________

  address: __________________________

  電話(tel):________傳真(fax):____________

  電子郵箱(e-mail):______________________

  買賣雙方同意按照下列條款簽訂本合同:

  the seller and the buyer agree to conclude this contract subject to the terms and conditions stated below:

  1. 貨物名稱、規(guī)格和質(zhì)量(name, specifications and quality of commodity):

  2. 數(shù)量(quantity):

  允許____的溢短裝(___%more or less allowed)

  3. 單價(unit price):

  4. 總值(total amount):

  5. 交貨條件(terms of delivery):fob/cfr/cif_______

  6. 原產(chǎn)地國與制造商(country of origin and manufacturers):

  7. 包裝及標準(packing):

  貨物應具有防潮、防銹蝕、防震并適合于遠洋運輸?shù)陌b,由于貨物包裝不良而造成的貨物殘損、滅失應由賣方負責。賣方應在每個包裝箱上用不褪色的顏色標明尺碼、包裝箱號碼、毛重、凈重及“此端向上”、“防潮”、“小心輕放”等標記。

  the packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. the seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. the measurement, gross weight, net weight and the cautions such as "do not stack up side down", "keep away from moisture", "handle with care" shall be stenciled on the su***ce of each package with fadeless pigment.

  8. 嘜頭(shipping marks):

  9. 裝運期限(time of shipment):

  10. 裝運口岸(port of loading):

  11. 目的口岸(port of destination):

  12. 保險(insurance):

  由____按發(fā)票金額110%投保_____險和_____附加險。

  insurance shall be covered by the ____for 110% of the invoice value against ______risks and _______additional risks.

  13. 付款條件(terms of payment):

  (1) 信用證方式:買方應在裝運期前/合同生效后__日,開出以賣方為受益人的不可撤銷的議付信用證,信用證在裝船完畢后__日內(nèi)到期。

  letter of credit: the buyer shall in ______days prior to the time of shipment /after this contract comes into effect, open an irrevocable letter of credit in favor of the seller. the letter of credit shall expire ____days after the completion of loading of the shipment as stipulated.

  (2) 付款交單:貨物發(fā)運后,賣方出具以買方為付款人的付款跟單匯票,按即期付款交單(d/p)方式,通過賣方銀行及_____銀行向買方轉(zhuǎn)交單證,換取貨物。

  documents against payment: after shipment, the seller shall draw a sight bill of exchange on the buyer and deliver the documents through sellers bank and ______bank to the buyer against payment, i.e d/p. the buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.

  (3) 承兌交單:貨物發(fā)運后,賣方出具以買方為付款人的付款跟單匯票,付款期限為_____后__日,按即期承兌交單(d/a __日)方式,通過賣方銀行及 銀行,經(jīng)買方承兌后,向買方轉(zhuǎn)交單證,買方在匯票期限到期時支付貨款。

  documents against acceptance: after shipment, the seller shall draw a sight bill of exchange, payable _____days after the buyers delivers the documents through sellers bank and ________bank to the buyer against acceptance(d/a _____days).the buyer shall make the payment on date of the bill of exchange.

  (4) 貨到付款:買方在收到貨物后__天內(nèi)將全部貨款支付賣方(不適用于fob、crf、cif術(shù)語)。

  cash on delivery (cod): the buyer shall pay to the seller total amount within _______days after the receipt of the goods (this clause is not applied to the terms of fob,cfr,cif).

  14. 單據(jù)(documents required):

  賣方應將下列單據(jù)提交銀行議付/托收:

  the seller shall present the following documents required to the bank for negotiation/collection:

  (1) 標明通知收貨人/受貨代理人的全套清潔的、已裝船的、空白抬頭、空白背書并注明運費已付/到付的海運/聯(lián)運/陸運提單。

  full set of clean on board ocean/combined transportation/land bills of lading and blank endorsed marked freight prepaid/ to collect;

  (2) 標有合同編號、信用證號(信用證支付條件下)及裝運嘜頭的商業(yè)發(fā)票一式__份;

  signed commercial invoice in ______copies indicating contract no., l/c no. (terms of l/c) and shipping marks;

  (3) 由______出具的裝箱或重量單一式__份;

  packing list/weight memo in _______copies issued by__;

  (4) 由______出具的質(zhì)量證明書一式__份;

  certificate of quality in _______copies issued by____;

  (5) 由______出具的數(shù)量證明書一式__份;

  certificate of quantity in _______copies issued by____;

  (6) 保險單正本一式__份(cif 交貨條件);

  insurance policy/certificate in _______copies (terms of cif);

  (7)____簽發(fā)的產(chǎn)地證一式__份;

  certificate of origin in _________copies issued by____;

  (8) 裝運通知(shipping advice): 賣方應在交運后_____ 小時內(nèi)以特快專遞方式郵寄給買方上述第__項單據(jù)副本一式一套。

  the seller shall, within ____hours after shipment effected, send by courier each copy of the above-mentioned documents no. __.

  15. 裝運條款(terms of shipment):

  (1) fob交貨方式

  賣方應在合同規(guī)定的裝運日期前30天,以____方式通知買方合同號、品名、數(shù)量、金額、包裝件、毛重、尺碼及裝運港可裝日期,以便買方安排租船/訂艙。裝運船只按期到達裝運港后,如賣方不能按時裝船,發(fā)生的空船費或滯期費由賣方負擔。在貨物越過船弦并脫離吊鉤以前一切費用和風險由賣方負擔。

  the seller shall, 30 days before the shipment date specified in the contract, advise the buyer by _______of the contract no., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the buyer can charter a vessel/book shipping space. in the event of the seller‘s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the seller‘s account.

  (2) cif或cfr交貨方式

  賣方須按時在裝運期限內(nèi)將貨物由裝運港裝船至目的港。在cfr術(shù)語下,賣方應在裝船前2天以____方式通知買方合同號、品名、發(fā)票價值及開船日期,以便買方安排保險。

  the seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. under cfr terms, the seller shall advise the buyer by _________of the contract no., commodity, invoice value and the date of dispatch two days before the shipment for the buyer to arrange insurance in time.

  16. 裝運通知(shipping advice):

  一俟裝載完畢,賣方應在__小時內(nèi)以____方式通知買方合同編號、品名、已發(fā)運數(shù)量、發(fā)票總金額、毛重、船名/車/機號及啟程日期等。

  the seller shall, immediately upon the completion of the loading of the goods, advise the buyer of the contract no., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by _________ within ________hours.

  17. 質(zhì)量保證(quality guarantee):

  貨物品質(zhì)規(guī)格必須符合本合同及質(zhì)量保證書之規(guī)定,品質(zhì)保證期為貨到目的港__個月內(nèi)。在保證期限內(nèi),因制造廠商在設計制造過程中的缺陷造成的貨物損害應由賣方負責賠償。

  the seller shall guarantee that the commodity must be in conformity with the quality, specifications and quantity specified in this contract and letter of quality guarantee. the guarantee period shall be ______months after the arrival of the goods at the port of destination, and during the period the seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer.

  18. 檢驗(inspection)(以下兩項任選一項):

  (1)賣方須在裝運前__日委托______檢驗機構(gòu)對本合同之貨物進行檢驗并出具檢驗證書,貨到目的港后,由買方委托________檢驗機構(gòu)進行檢驗。

  the seller shall have the goods inspected by ______days before the shipment and have the inspection certificate issued by____. the buyer may have the goods reinspected by ________ after the goods arrival at the destination.

  (2) 發(fā)貨前,制造廠應對貨物的質(zhì)量、規(guī)格、性能和數(shù)量/重量作精密全面的檢驗,出具檢驗證明書,并說明檢驗的技術(shù)數(shù)據(jù)和結(jié)論。貨到目的港后,買方將申請中國商品檢驗局(以下簡稱商檢局)對貨物的規(guī)格和數(shù)量/重量進行檢驗,如發(fā)現(xiàn)貨物殘損或規(guī)格、數(shù)量與合同規(guī)定不符,除保險公司或輪船公司的責任外,買方得在貨物到達目的港后__日內(nèi)憑商檢局出具的檢驗證書向賣方索賠或拒收該貨。在保證期內(nèi),如貨物由于設計或制造上的缺陷而發(fā)生損壞或品質(zhì)和性能與合同規(guī)定不符時,買方將委托中國商檢局進行檢驗。

  the manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspection. after arrival of the goods at the port of destination, the buyer shall apply to china commodity inspection bureau (hereinafter referred to as ccib) for a further inspection as to the specifications and quantity/weight of the goods. if damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this contract, except when the responsibilities lies with insurance company or shipping company, the buyer shall, within _____days after arrival of the goods at the port of destination, claim against the seller, or reject the goods according to the inspection certificate issued by ccib. in case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the contract, the buyer shall, during the guarantee period, request ccib to make a survey.

  19. 索賠(claim):

  買方憑其委托的檢驗機構(gòu)出具的檢驗證明書向賣方提出索賠(包括換貨),由此引起的全部費用應由賣方負擔。若賣方收到上述索賠后______天未予答復,則認為賣方已接受買方索賠。

  the buyer shall make a claim against the seller (including replacement of the goods) by the further inspection certificate and all the expenses incurred thereafter shall be borne by the seller. the claims mentioned above shall be regarded as being accepted if the seller fail to reply within ______days after the seller received the buyer’s claim.

  20. 遲交貨與罰款(late delivery and penalty):

  除合同第21條不可抗力原因外,如賣方不能按合同規(guī)定的'時間交貨,買方應同意在賣方支付罰款的條件下延期交貨。罰款可由議付銀行在議付貨款時扣除,罰款率按每__天收__%,不足__天時以__天計算。但罰款不得超過遲交貨物總價的____ %。如賣方延期交貨超過合同規(guī)定__天時,買方有權(quán)撤銷合同,此時,賣方仍應不遲延地按上述規(guī)定向買方支付罰款。

  買方有權(quán)對因此遭受的其它損失向賣方提出索賠。

  should the seller fail to make delivery on time as stipulated in the contract, with the exception of force majeure causes specified in clause 21 of this contract, the buyer shall agree to postpone the delivery on the condition that the seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. the rate of penalty is charged at______% for every ______days, odd days less than _____days should be counted as ______days. but the penalty, however, shall not exceed_______% of the total value of the goods involved in the delayed delivery. in case the seller fail to make delivery ______days later than the time of shipment stipulated in the contract, the buyer shall have the right to cancel the contract and the seller, in spite of the cancellation, shall nevertheless pay the aforesaid penalty to the buyer without delay.

  the buyer shall have the right to lodge a claim against the seller for the losses sustained if any.

  21. 不可抗力(force majeure):

  凡在制造或裝船運輸過程中,因不可抗力致使賣方不能或推遲交貨時,賣方不負責任。在發(fā)生上述情況時,賣方應立即通知買方,并在__天內(nèi),給買方特快專遞一份由政府主管當局簽發(fā)的事故證明書。在此情況下,賣方仍有責任采取一切必要措施加快交貨。如事故延續(xù)__天以上,買方有權(quán)撤銷合同。

  the seller shall not be responsible for the delay of shipment or non-delivery of the goods due to force majeure, which might occur during the process of manufacturing or in the course of loading or transit. the seller shall advise the buyer immediately of the occurrence mentioned above and within_____ days thereafter the seller shall send a notice by courier to the buyer for their acceptance of a certificate of the accident issued by the competent government authorities under whose jurisdiction the accident occurs as evidence thereof. under such circumstances the seller, however,are still under the obligation to take all necessary measures to hasten the delivery of the goods. in case the accident lasts for more than _____days the buyer shall have the right to cancel the contract.

  22. 爭議的解決 (arbitration):

  凡因本合同引起的或與本合同有關的任何爭議應協(xié)商解決。若協(xié)商不成,應提交中國國際經(jīng)濟貿(mào)易仲裁委員會,按照申請時該會當時施行的仲裁規(guī)則進行仲裁,仲裁地點在中國深圳。仲裁裁決是終局的,對雙方均有約束力。

  any dispute arising from or in connection with the contract shall be settled through friendly negotiation. in case no settlement is reached, the dispute shall be submitted to china international economic and trade arbitration commission(cietac), for arbitration in accordance with its rules in effect at the time of applying for arbitration. the place of arbitration is in ____, china. the arbitral award is final and binding upon both parties.

  23. 通知(notices):

  所有通知用____文寫成,并按照如下地址用傳真/快件送達給各方。如果地址有變更,一方應在變更后__日內(nèi)書面通知另一方。

  all notice shall be written in _____ and served to both parties by fax/courier according to the following addresses. if any changes of the addresses occur, one party shall inform the other party of the change of address within ____days after the change.

  24. 本合同使用的fob、cfr、cif術(shù)語系根據(jù)國際商會《國際貿(mào)易術(shù)語解釋通則》。

  the terms in the contract are based on incoterms 1990 of the international chamber of commerce.

  25. 附加條款(additional clause):

  本合同上述條款與本附加條款抵觸時,以本附加條款為準。

  conflicts between contract clause here above and this additional clause, if any, it is subject to this additional clause.

  26. 本合同用中英文兩種文寫成,兩種文具有同等效力。本合同共__份,自雙方代表簽(蓋章)之日起生效。

  this contract is executed in two counterparts each in chinese and english, each of which shall deemed equally authentic. this contract is in ______copies, effective since being signed/sealed by both parties.

  買方代表人(簽):

  representative of the buyer

  (authorized signature):

  賣方代表人(簽):

  representative of the seller

  (authorized signature):

  聯(lián)系方式:

英文合同 篇4

  Three-party Property Sales & Purchase Agreement

  甲 方 (賣方): Party A (Seller): _______________________________ 乙 方 (買方): Party B (Buyer): _______________________________ 丙方(居間方):北京安信瑞德房地產(chǎn)經(jīng)紀有限公司 店

  Party C (Agent): Beijing Anxiuide Real Estate Brokerage Co. Ltd.

  Office

  合同編號:S-34-700000

  編號:____________

  Agreement No.: S-34-700000

  溫馨提示:

  尊敬的客戶,您好!歡迎您成為21世紀中國不動產(chǎn)客戶大家庭中的一員,能為您提供服務,我們感到非常榮幸!為了維護您的.權(quán)益,當您向本公司支付任何一筆款項時,務必要求我公司業(yè)務人員提供蓋有本公司印章或財務章的收據(jù)或發(fā)票,以此確認本公司收到該款項,否則,本公司不予認可。

  Dear customer,

  Thank you for choosing Century21 China Real Estate. It is our honor to provide you with our services!

  For your interest, please claim payment receipt or invoice with our company’s chop from your agent when you make any payment to our company.

  您的成交委托協(xié)議編號:

  The serial number of your entrustment agreement :______________________________

  咨詢電話:65610088-124 全國統(tǒng)一客服電話:400-650-8821

  Customer Hotline in Beijing: 65610088—124

  Nationwide Customer Service Hotline: 4006-50-8821

  每家加盟店獨立擁有和運營

  Three-party Property Sales & Purchase Agreement

英文合同 篇5

  合同號:_________

  no:_________

  日期:_________

  date:_________

  為在平等互利的基礎上發(fā)展貿(mào)易,有關方按下列條件簽訂本協(xié)議:

  this agreement is entered into between the parties concerned on the basis of equality and mutual benefit to develop bussiness on terms and conditions mutually agreed upon as follows:

  1.訂約人

  contracting parties

  供貨人(以下稱甲方):_________

  supplier(hereinafter called “party a”):_________

  銷售代理人(以下稱乙方):_________

  agent(hereinafter called “party b”):_________

  甲方委托乙方為銷售代理人,推銷下列商品。

  party a hereby appoint party b to act as his selling agent to sell the commodity mentioned below.

  2.商品名稱及數(shù)量或金額

  commodity and quantity or amount

  雙方約定,乙方在協(xié)議有效期內(nèi), 銷售不少于_________的商品。

  it is mutually agreed that party b shall undertake to sell not less than _________ of the aforesaid commodity in the duration of this agreement。

  3.經(jīng)銷地區(qū)

  territory

  只限在_________。

  in _________ only.

  4.訂單的確認

  confirmation of orders

  本協(xié)議所規(guī)定商品的數(shù)量、價格及裝運條件等,應在每筆交易中確認,其細目應在雙方簽訂的銷售協(xié)議書中作出規(guī)定。

  the quantities, prices and shipments of the commodities stated in this agreement shall be confirmed in each transaction, the particulars of which are to be specified in the sales confirmation signed by the two parties hereto.

  5.付款

  payment

  訂單確認之后,乙方須按照有關確認書所規(guī)定的時間開立以甲方為受益人的保兌的、不可撤銷的即期信用證。乙方開出信用證后,應立即通知甲方,以便甲方準備交貨。

  after confirmation of the order, party b shall arrange to open a confirmed, irrevocable l/c available by draft at sight in favour of party a within the time stipulated in the relevant s/c. party b shall also notify party a immediately after l/c is opened so that party a can get prepared for delivery.

  6.傭金

  commission

  在本協(xié)議期滿時,若乙方完成了第二款所規(guī)定的數(shù)額,甲方應按裝運貨物所收到的發(fā)票累計總金額付給乙方_________%的傭金。

  upon the expiration of the agreement and party b's fullfilment of the total turnover mentioned in article 2, party a shall pay to party b _________% commission on the basis of the aggregate amount of the invoice value against the shipments effected.

  7.市場情況報告

  reports on market conditions

  乙方每3個月向甲方提供一次有關當時市場情況和用戶意見的詳細報告。同時,乙方應隨時向甲方提供其他供應商的類似商品樣品及其價格、銷售情況和廣告資料。

  party b shall forward once every three months to party a detailed reports on current market conditions and of consumers' comments. meanwhile, party b shall,from time to time, send to party a samples of similar commodities offered by other suppliers, together with their prices, sales information and advertising materials.

  8.宣傳廣告費用

  advertising & publicity expenses

  在本協(xié)議有效期內(nèi),乙方在上述經(jīng)銷地區(qū)所作廣告宣傳的一切費用,由乙方自理。乙方須事先向甲方提供宣傳廣告的圖案及文字說明,由甲方審閱同意。

  party b shall bear all expenses for advertising and publicity within the aforementioned territory in the duration of this agreement and submit to party a all patterns and/or drawings and description for prior approval.

  9.協(xié)議有效期

  validity of agreement

  本協(xié)議經(jīng)雙方簽字后生效,有效期為_________天,自_________至_________。若一方希望延長本協(xié)議,則須在本協(xié)議期滿前1個月書面通知另一方,經(jīng)雙方協(xié)商決定。

  若協(xié)議一方未履行協(xié)議條款,另一方有權(quán)終止協(xié)議。

  this agreement, after its being signed by the parties concerned, shall remain in force for _________ days from _________ to _________ if either party wishes to extend this agreement, he shall notice, in writing, the other party one month prior to its expiration. the matter shall be decided by the agreement and by consent of the parties hereto. should either party fail to implement the terms and conditions herein, the other party is entitled to terminate this agreement.

  10.仲裁

  arbitration

  在履行協(xié)議過程中,如產(chǎn)生爭議,雙方應友好協(xié)商解決。若通過友好協(xié)商達不成協(xié)議,則提交中國國際貿(mào)易促進委員會對外貿(mào)易仲裁委員會,根據(jù)該會仲裁程序暫行規(guī)定進行仲裁。該委員會的決定是終局的,對雙方均具有約束力。仲裁費用,除另有規(guī)定外,由敗訴一方負擔。

  all disputes arising from the execution of this agreement shall be settled through friendly consultations. in case no settlement can be reached, the case in dispute shall then be submitted to the foreign trade arbitration commission of the china council for the promotion of international trade for arbitration in accordance with its provisional rules of procedure. the decision made by this commission shall be regarded as final and binding upon both parties. arbitration fees shall be borne by the losing party ,unless otherwise awarded.

  11.其他條款

  other terms & conditions

  (1)甲方不得向經(jīng)銷地區(qū)其他買主供應本協(xié)議所規(guī)定的商品。如有詢價,當轉(zhuǎn)達給乙方洽辦。若有買主希望從甲方直接訂購,甲方可以供貨,但甲方須將有關銷售確認書副本寄給乙方,并按所達成交易的發(fā)票金額給予乙方_________%的傭金。

  party a shall not supply the contracted commodity to any other buyer(s) in the above mentioned territory. direct enquiries, if any, will be referred to party b. however, should any other buyers wish to deal with party a directly, party a may do so. but party a shall send to party b a copy of sales confirmation and give party b _________% commission on the basis of the net invoice value of the transaction(s)concluded.

 。2)若乙方在_________月內(nèi)未能向甲方提供至少_________訂貨,甲方不承擔本協(xié)議的`義務。

  should party b fail to pass on his orders to party a in a period of _________ months for a minimum of _________, party a shall not bind himself to this agreement.

 。3)對雙方政府間的貿(mào)易,甲方有權(quán)按其政府的授權(quán)進行有關的直接貿(mào)易,而不受本協(xié)議約束。乙方不得干涉此種直接貿(mào)易,也無權(quán)向甲方提出任何補償或傭金要求。

  for any business transacted between governments of both parties, party a may handle such direct dealings as authorized by party a's government without binding himself to this agreement. party b shall not interfere in such direct dealings nor shall party b bring forward any demand for compensation therefrom.

 。4)本協(xié)議受簽約雙方所簽訂的銷售確認條款的制約。

  this agreement shall be subject to the terms and conditions in the sales confirmation signed by both parties hereto.

  12.本協(xié)議于_________年_________月_________日在_________簽訂,正本兩份,甲乙雙方各執(zhí)一份。

  this agreement is signed on _________ at _________ and is in two originals;each party holds one.

  甲方(簽字):_________ 乙方(簽字):_________

  party a(signature):_________ party b(signature):_________

【英文合同】相關文章:

英文合同范文03-13

英文購銷合同05-04

借款合同英文04-28

英文合同必備詞匯03-19

精選英文合同三篇12-25

【精選】英文合同四篇12-26

精選英文合同四篇02-03

英文翻譯合同02-28

【精選】英文合同4篇04-29

設備采購合同英文05-10